Chitral Times Report
PESHAWAR: The Provincial Development Working Party (PDWP) held its meeting under the Chairmanship of Dr. Shahzad Khan Bangash, the Additional Chief Secretary Khyber Pakhtunkhwa on 8th October, 2019. This was the longest session/meeting of PDWP of the Current Financial year 2019-20 which held for consecutive 9 hours. The meeting was attended by Mr. Khalid Ilyas, Secretary P&D Department, members of PDWP, concerned departments and Districts level officers of Merged Areas. The forum considered 100 projects pertaining to different sectors including Industries, Mines & Minerals, Information, Law & Justice, Urban Development, Roads & Bridges, Health, Auqaf, Higher Education, Elementary & Secondary Education, Relief & Rehabilitation, Water, DWSS, Home, Agriculture and AIP sectors for the uplift of the province and Merged Areas. The forum
approved 91 Projects with an estimated cost of Rs. 88038.381 million. 9 projects were deferred due to inadequate designs and were returned to their respective departments for rectification.
.
The PDWP has approved 20 projects of Rs. 37230.42 million under the Accelerated Implementation Program/Tribal Decade Strategy. This will usher in a new era of development in the merged areas which will help brining it at par with the rest of the province. The Chair directed that as committed, the processing and approval of projects of Accelerated Implementation Programme (AIP) has been given top priority.
.
Approved projects of the Industries sector were:
1. Access Road to Rashakai Special Economic Zone.
2. Establishment of Khyber Pakhtunkhwa Skill Development Fund. Approved project of information sector was:
1. Establishment of PMU for Operationalization of Five FM Radio Stations in Merged Areas.
Approved project of Law & Justice sector was:
.
1. F/S and Construction of Judicial Complex, D.I.Khan
.
Approved project of Urban Development sector was:
1. Improvement & Beautification of various Traffic Congestion point in District Peshawar (Zone-F as identified by UPU Team & Transport Department) Pilot Project.
.
Approved projects of Road & Bridges sector were:
1. Imrovement and widening and BT of road from Tangi Bucha bridge to Serai via Ghandheri and Zegai to Bucha Khan Kili, from Cheena to Sherpao via Ghazo dheri i/c link road to Tootakai Tehsil Tangi Distt Charsadda.
2. Construction of roads in Ucs MC1,2,3,4, Mera prang, Doolat pura, Agra, Hisara yaseenzai, Tarnao, Kangra and Battagram District Charsadda.
3. F/S, Design and Dualization of 16 KM Road from Jamil Chowk (Ring Road) towards Urmar Payan Peshawar (Rev).
4. Construction of roads in PK-66, District Peshawar.
5. Rehabilitation/Const. of Roads/Internal roads at UCs Haryana,
Gulbela, Takhtabad, khazana, kankola, Pakha Ghulam, nahaqi, & adjoining areas including bridge, and Const of street Malik Saad Colony, Duranpur, Ring road, Peshawar.
6. Construction / Improvement of roads in Topi, Swabi and Lahore, District Swabi.
7. Construction of Kharkay Road, Mardan.
8. Construction/ Rehabilitaion of Roads at UCs Fatma, Babini, Gujrat, Garyala, Ghari Daulatzai, Bagicha Dheri, Shahbaz Ghari, Rural Mardan, Bakshali, Mardan.
9. Construction/Rehab of rural roads / Culverts/streets/drainage system / clearance of drainage system at UCs Ghala Dher, Mohabbat Abad, Rorya, Muslim Abad, Guli Bagh Bari Cham, Hoti, Par Hoti, Sikandary & Bicket Gunj in District Mardan.
10. Construction/ BT/Rehabilitation of Roads at UCs Manga,Khazana Dheri,Chamtar,Maho Dheri,Baghdada, Dagai,Kass koroona,Mardan Khass, bicket ghani, bijli ghar,Baghe ram, Cantt, koragh, gharib abad, District Mardan.
11. Construction/ Rehabilitation/ Improvement of different roads in various UCs of District Mardan i.e Gujar Garhi, jehangir abad, sari balol, kot jungurio, pat baba, daman koh, saro shaha, nara Mardan.
.
12. Construction of Spinkai Katlang road (6Km), District Mardan.
13. Construction /Rehabilitaiton of roads/Construction of Bridges/Dualization at UCs Alo, Kharki, Dheri, Qasmi, Shamozia, Mian Essa, Kati Garhi, Babozai VC Shah Bathkhela VC Dewan Khel District Mardan.
14. FS and Design of road from Odigram to Guligram, Swat.
15. Construction of roads a) Kandak – Jehangir Malikdam Road Barikot, b) Rangilla Shamozai to Segawali, c) Talang-Churkhai, d) Najigram-Samsari, District Swat.
16. F/S, Design & improvement, Widening & BT of Mangwaltan to Toha Road (6.5 Km), District Swat (Rev).
17. Const of Rds Sorpatu-Shunyal-Talkr, JafarAbad-Cheno Barai, Mato Shomi Rd, Salend Sardan Rema Dando Rd, Sherpalm-Amlok Banr rd Gwalri-Kwaro Cham Kamrtai Balirkis a/w Bridge, Sarbnda Dop rd, Dero Zyartkhpa rd, Weni Dagi Manro Paty rd, Nilagram rd. Swat.
18. Upgradation & Strengthening of C&W roads in PK-20 District Buner.
19. Construction / Widening /Rehabilitation / Blacktopping / PCC of C&W roads in PK-20 District Buner.
20. F/S, design, improvement, B/T and extension of Budal-Jabo road via Sher Ali, (20-KM) District Buner.
21. Construction of 10 Km Shingle Road/ Jeepable tracks in PK-78 Buner.
22. Construction and Blacktopping of roads in PK-77 District Buner.
23. Construction of Chakdarra Bypass Road (6 Km), Dir Lower.
24. Construction of Internal Roads in the Entire UCs of PK-41 District Haripur.
25. Up-gradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa.
26. Construction & BT of Road from Barara Mera Khel Hamedi Road Hassan Khel to Khujari (3.9) KM Bannu.
27. F/S & Construction of Hindi Khel Haved Road (PK-72), District Bannu.
28. Construction of Blacktop Road in Wana, District South Waziristan.
29. Maintenance & Rehabilitation of 22-kms Existing Black Topped roads in Bajaur Agency.
30. Construction of Bypass Roads under Restoration of Damaged
Infrastructure in Conflict Affected Areas of Merged Areas SH: Tribal Commission/Land Compensation.
31. Construction of 6-Kms Black Top Road from Dashka to Razin Haris Koroona Tehsil Makin District South Waziristan.
32. Construction of 4 Kms BTR Shakir Kalay Area Darazinda Sub Division.
33. Construction of 5 Kms BTR Ramzan Abad Ustrana Darazinda Sub Division.
34. Strengthening of East-West connectivity of Merged Areas with settled Districts & Important links.
SH-1: Feasibility study and Designing of “Improvement of Khar Mamad Gat (Mohmand Boundary) road 31 KM. SH-2: Feasibility Study and Designing of “Improvement of road from Khar to Timergara & Toor Ghundi _ Khar. road (38.80 KM). SH-3: Feasibility Study and desigining of “Improvement & Rehabilitation of road from Pir Qala to Ghalanai (14 KM)
(Balance Portion)”. SH-4: Feasibility Study and Designing of “Improvement of Thall Mirali (NWA) road (54 Km).
35. Construction/ Rehabilitaion and repair of roads in Tehsil Kabal District Swat.
36. Construction/ Rehabilitation/ Widening/ PCC/ BT of internal roads in
UCs Sakhra, Darmai, Ashray, Durushkhela, Baidara, Khairari, Chuprial, Barthana & adjoining areas of District Swat.
37. Strengthening of East-West connectivity of Merged Areas with settled Districts & Important links. SH: High Impact Schemes of Merged Districts and Ex-FRs.
.
Approved projects of Health sector were:
1. Up-Gradation of existing DHQ Hospital into 500 bedded Category-A Teaching Hospital in Karak.
2. Establishment of Women & Children Hospital in District Swabi.
3. Upgradation of Sarqalla RHC to Category-D Hospital in PK-21, Distt Buner.
4. Up-Gradation of THQ Hospital Bisham from Cat-D to Cat-C Hospital, District Shangla.
5. Establishment of Paeds Hospital at District Swat.
6. Upgradation of existing THQ Hospital Matta to Cat-B Hospital (Vertical Expansion) along with (Level-II) Trauma Center/Accident & Emergency Center, District Swat.
7. Establishment of District Head Quarter Hospital at Ghazi Abad, District Kolai Palas.
8. Establishment of Paramedics College & Male Nursing College in Lakki Marwat.
9. Establishment of Saidu College of Dentistry in the existing Saidu Medical College.
10. Topping-up of MNCH Program, Merged District (MDs) (2019-20).
11. Opening of 20 CHCs / CDs in Khyber Agency.
12. Opening of 41 CHCs / CDs in Mohmand Agency.
13. Opening of 11 CHCs / CDs in FR Peshawar.
14. Addition of 100 Specialists (Consultants) @ approx Rs. 450,000/ month with contractual KPIS for key specialties.
15. Provision of doctors at far flung areas (=300 doctors @ Rs. 200,000/month).
16. Introduction of Portable Ultrasounds at 24/7 BEMOC facilities including training of Skilled Birth Attendants.
17. Provision of Emergency MOs at Secondary hospitals (15 / AHQ and 6 /
THQ @ Rs. 300,000 / month).
18. Provision of portable ultrasound facilities in existing health facilities in merged areas.
.
Approved project of Auqaf sector was:
1. Special Package for mainstreaming of minorities Newly Merges Areas.
Approved projects of Higher Education sector were:
1. Establishment of 4 Nos Degree Colleges ( 02 for Girls in Orakzai, 01 each for boys and girls in Wana South Waziristan.
2. Feasibility Study for Establishment of University in North Waziristan.
3. Provision of Transprt Facilities to the Government Colleges of Newly Merged Areas.
4. F/S Establishment of Education City Barwand Mehsud Area District South Waziristan.
.
Approved projects of Elementary & Secondary Education sector were:
1. Provision of basic infrastructure, teacher and other inputs at education facilities. Development of Play areas in schools of Merged Areas under AIP TDS for E&SE Department.
2. Provision of Stipends to Secondary School Girls Studetns of Khyber Pakhtunkhwa (Phase-XV) (SBSE).
3. Capacitating 500 ECE Rooms in Government Primary Schools in Khyber Pakhtunkhwa (SBSE).
.
Approved project of Relief & Rehabilitation sector was:
1. Establishment of emergency rescue service (Rescue 1122) in All Tribal Districts & 06 FR (Sub Divisions) of Khyber Pakhtunkhwa.
Approved projects of Water sector were:
1. Construction/ Improvement of Flood Protection Works, Chennels, Tubewells and Crossing Facilities on need basis in Tehsils Alpuri and Bisham District Shangla.
2. Construction of flood protection works, irrigation channels and installation of solar tube wells in Khyber Pakhtunkhwa on need basis.
3. Construction & improvement of drainage system, channels/canals, ponds, roads, bridges/culverts and flood protection works in District Nowshera.
4. Improvement/ construction of channels, flood protection works, drains, roads, bridges/ causeway & installation of solar irrigation tube wells in tehsils Topi, Swabi & Lahore of district Swabi.
5. Re-alignment of Nipki Khail Irrigation Channel district Swat.
6. Construction of Chaprial Channel and Improvement & Extension of Fatehpur & Barat Khel Irrigation Channels District Swat.
7. Construction of Derakai Weir Project, District Bajur (ADB Funded).
8. Construction of Tarkho Kas Weir District Khyber Sub Project (ADB funded).
9. Command Area Development of Raghagan Dam District Bajur (ADB funded).
10. River Training Works on Main Rivers in Tribal Districts.
11. Construction of Potential Surface Irrigation Schemes in Tribal District
12. Construction of Check Dams/Water Storage Reservoirs in Tribal Districts.
13. Solarization of Existing Irrigation Tube Wells in Tribal Districts
14. Improvement of Existing and Construction of New Irrigation System/Resources. Sub scheme: Remodeling & Extension of Bara River Canal System District Khyber
15. Development of Command Area under Completed Small Dams in Merged Districts.
16. Construction Rehabilitation of other Feasible Dam Schemes. Sub Scheme: Gomal Zam Dam Multipurpose Project. (Merged Area share) “Clearance of outstanding Liabilities relating to Security Charges of Defunct FATA MAs.
17. Construction Rehabilitation of other Feasible Dam Schemes. Sub
Scheme: Construction of Check Dam/Water Storage Reservoirs on need Basis accorss Merged Districts.
18. Reconstruction/ Rehabilitation of Canal Petrol road/ Flood Protection works in Tehsil Kabal District Swat.
.
Approved Projects of DWSS sector were:
1. Rehabilitation /Solarization of existing DWSS schemes with amended operational timings.
2. Construction and Solarization of new DWSS schemes including Gravity Based schemes.
.
Approved Project of Home sector was:
1. “Parole and Probation, prison and Prosecution, Judicial Lockup, Levies Transformation, Police Stations and Levy Lines and Training Programs including legal literacy (awareness of general masses about new criminal justice system)”
.
Approved project of Special Implementation Arrangements sector was:
1. Establishment of Accelerated Development Unit.
.
Approved Project of Agriculture sector was:
1. Livestock Productivity enhancement in Merged Areas.
————